|
Structure 7:

This structure
has located in the gap of existing height in the north or Tiss village and
deviation read toward Konarak.
The area of
this structure is over 300 hectare which it prepared 622 hectare of it
hosed on industrial pole.
|
622 hectare |
Industrial pole |
More Informaiton:
|
|
|