|
Plans for investment in term belong to company Specialized in civil
development
A. long term
investing plans in development part:
-
constructing the excursion and recreational complex in free area coasts of
Chabahar( extrusion village)
-
building the recreational complexes in Baharan park Lands
-
Investing (funding) in part at seeding production and green area.
-
constructing the light industries workshop
-
creating permanent exhibition for constructor material and building
technology(marketing at modern a constructor material )
-
Factory
for producing pre- constructed panel.
-
Factory
for central concrete production.
-
constructing the sports and recreational complex in vicinity to lypar hotel
and specific villas
|
B. long term funding plans in civil part:
-
plan for collecting and mechanized recycling of the origin
-
Studying
plan for recycling the sewage for using in green area of Chabahar free area.
-
Creating
pressurized irrigation system for using in the green area.
-
the design for making B.T the parts of eastern zone park.
|
C. long term
investing plans in Tele communication part belong to
Chabahar free area
-
The
plan for assimilating the software bed in free area machinery level.
-
The
plan for correspondence system in the whole area and producing the function
circuit management system.
-
the
plan for securing the information Network
-
Creating the final plan of growth center and multi_ purpose building.
-
The
plan for electronic training system of Chabahar international university.
-
playing
for using Linux as on the area servers
-
designing and implementing the electronic signing system
-
The
developing plan for using multipurpose intelligence cards
-
launching the portal site for generating the figurative stores
-
Plan
for developing the possibility for wideband accessing to information Network
of Chabahar free area (band Wan wide) for distributing e4lectronic services.
-
Teleport plan Chabahar free zone.
|
D. long term investing plans in water, sewage and electricity part
-
Constricting sewage refinery of residential
structure regarding to day- to day increasing of residential units.
-
Constructing sewage refinery of industrial
structure regarding to lacking of refinery and connecting non-allowed breakaways
to sewage collecting Network which causes the blockage of Network in long term.
-
Implementing the residential structure sewage
transferring line of structure 3 to a specific place of structure 3 his
refinery.
-
connecting the southern structure sewage
transferring line to residential structure sewage transferring line
-
implementing and complementing the bulk head wall
of structure ones sandy sewage regarding to that wall deconstruction because of
flood arising of rain- fall
-
implementing the water transferring line of 2000m3
reservoirs located in 170m height to the specific place of 1000m3 reservoir
located in 140m height and finally implementing the transferring line to 500m3
reservoirs located in 114m height of first structure.
-
Lightening Network of 45 and axis of southern gate
to Nahalestan square.
-
Electricity provision to non-pollutant workshops
of structure2.
|
|
|
|