Civil Projects : | | Home | Site Map |

Plans for investment in term belong to company Specialized in civil development

A. long term investing plans in development part:

  • constructing the excursion and recreational complex in free area coasts of  Chabahar( extrusion village)
  • building the recreational complexes in Baharan park Lands
  • Investing (funding) in part at seeding production and green area.
  • constructing the light industries workshop
  • creating permanent exhibition for constructor material and building technology(marketing at modern a constructor material )
  • Factory for producing pre- constructed panel.
  • Factory for central concrete production.
  • constructing the sports and recreational complex in vicinity to lypar hotel and specific villas

B. long term funding plans in civil part:

  • plan for collecting and mechanized recycling of the origin

  • Studying plan for recycling the sewage for using in green area of Chabahar free area.

  • Creating pressurized irrigation system for using in the green area.

  • the design for making B.T the parts of eastern zone park.

C. long term investing plans in Tele communication part belong to Chabahar free area

  • The plan for assimilating the software bed in free area machinery level.
  • The plan for correspondence system in the whole area and producing the function circuit management system.
  • the plan for securing the information Network
  • Creating the final plan of growth center and multi_ purpose building.
  • The plan for electronic training system of Chabahar international university.
  • playing for using Linux as on the area servers
  • designing and implementing the electronic signing system
  • The developing plan for using multipurpose intelligence cards
  • launching the portal site for generating the figurative stores
  • Plan for developing the possibility for wideband accessing to information Network of Chabahar free area (band Wan wide) for distributing e4lectronic services.
  • Teleport plan Chabahar free zone.

D. long term investing plans in water, sewage and electricity part

  • Constricting sewage refinery of residential structure regarding to day- to day increasing of residential units.

  • Constructing sewage refinery of industrial structure regarding to lacking of refinery and connecting non-allowed breakaways to sewage collecting Network which causes the blockage of Network in long term.

  • Implementing the residential structure sewage transferring line of structure 3 to a specific place of structure 3 his refinery.

  • connecting the southern structure sewage transferring line to residential structure sewage transferring line

  • implementing and complementing the bulk head wall of structure ones sandy sewage regarding to that wall deconstruction because of flood arising of rain- fall

  • implementing the water transferring line of 2000m3 reservoirs located in 170m height to the specific place of 1000m3 reservoir located in 140m height and finally implementing the transferring line to 500m3  reservoirs located in 114m height of first structure.

  • Lightening Network of 45 and axis of southern gate to Nahalestan square.

  • Electricity provision to non-pollutant workshops of structure2.