About the background of the company of water, electricity
and sewage:
- Exacting the transpiring line and net distributing
of water in the first area of expansion (230 hectare)
- Building the 100, 250 and 500 M^3 stories and
water pumping station and watching building in the 230 hectare.
- Exacting the net gathering of sewage and
liquidation in the 230 hectares of Chabahar.
- Executing of water distributing net of the guest
house, villas and territonal storage of first expansions.
- Net gathering and repelling of guest house, villa
and storage sewage.
- Water distributing net of residential territory in
third status.
- Net gathering of swages of residential territory
in third status.
- Water distributing net and 500 m^2 aerial storage.
- Net gathering of swage in industrial pole.
- 500 m^3 storage and water pumping station and
transferring line of industrial area.
- 100 m^3 storage and water pumping station and the
industrial area to the trees village.
- 1000 m^3 storages and water pumping station and
the trees village to the third residential statues.
- Building the places changing the salty water to
the sweet water with the capacity of 2000 and 10000 m^3.
The major activities in the Electricity poots:
- Building the one orbit line of 63KV from the hovered
road of Nikshahr, Chabahar – Konarak to the 20/63 KV.
- Building the 20/63 KV post (Nahalestan of 7th
states)
- Building the 2 orbit line of 20KV from the post of the
second number of Chabahar to the commercial area of first states (30
hectares)
- Building the 2 orbit of 20 KV from the Nahalestan post
to the comerical area of first states (230 hectares)
- Building the 20 KV net and light of the “”””””” and
green space of first states (230 Hectare) such as commercial and working
place without any pollution.
- Building the electricity net, and 400/20 KV post of
third states of the north residential area and preparing the light of the
international university of the 3 states of south area.
- Building the light of the 45 m BLV. In the first
states and 85 m BLV. Of the international fair and north gate.
- Building the 20KV net and the light of the fair’s
pavement of 7th statues.
- Building the light net of D storage and skating post
of first states (230 hectares)
- Building the light net of 20KV net low pressure and
the light of the storages in the 7th states of industrial pole.
- Building the light of 20KV net and low pressure and
the light of the coastal area to Tees.
- Lighting the edge of the 1/3 states and the Tees
mountain and building 2 machines 100KVA for aerial posting in the tees and
coastal of area of 5/6 statues.
- Building the 20 KV net to preparing the light of
Hamoor Company and Navigation Company.
- Building the low pressure net and light of the
pavement for issued card in the 113 statues.
- Study for the building of power station in Chabahar.
- Building and using the 400
KV and 20 KV territorial post of international university (under
construction)